after a full day

Aside from removing the trim and carpet, I also helped my husband with the electrical (he installed 4 can lights on a dimmer switch), tested paint colors, and then primed the wall that had the lines from the built-in. It was a good day.

20130906-212629.jpg
20130906-213827.jpg
Tomorrow – paint ceiling white and put a cool green turquoise color on the walls. Then I head to Vail for an evening wedding, sans kiddos no less, and try not to wish I were still working on the office. I have a hard time leaving “project mode.” Wine should help.

Sunday and Monday will bring staining the alder trim and nailing down the hardwood floor. Maybe we will have a floor by Tuesday night’s party. That would be awesome!

20130906-212644.jpg

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s